Yesterday was another wet winter day in Julian--but we kept busy and warm (for the most part) in the house.
We put the kitchen range into its place, lifting it carefully over the pretty new floors.Matt showed off some acrobatic skill getting it plugged in.
Emily climbed into its hole to try to corral the cord into place so it'd all fit nicely...
and then showed her acrobatic skill in getting out before it slid into its final place.
Nice, eh?
We put up all the final bits of window and door trim, and Mom worked hard getting them all sanded and ready for lacquer.
Emily and I put up the rest of the baseboard--now it's all in place. Even behind the laundry area and in the closets. :)
Matt started hanging the lovely new shower door downstairs--the doors in place, but the tile-cutting bit wore out before he could get the side panel installed. It's gonna look great, though!
And, again, Mom worked at conquering the muddy disaster that has become of our entryway. Now there's plastic dropcloth protecting it. And, someday, hopefully, our walkway paths will make travel from the street and the garage a little less muddy...
As Mom and Dad left, the snow began to fall. Matt and I stayed to lacquer the new wood trim, and by the time we left, there were 3" of snow in the driveway. It was coming down fast, in giant clumps!
We're happy to report that the window and door trim is all installed and lacquered, the baseboard all in, the pump that recirculates hot water all wired and functioning, stairway trim partway done, appliances installed...and we're nearly ready for an inspection. Perhaps one more weekend of clean-up and odd jobs and we'll be ready. :) Then (inspector willing) we'll be ready for a real electrical hookup. And we can turn the heater on. Ahhh...
Plus, Dad's been hard at work on cabinet doors and drawer fronts in his home workshop. Soon we'll be lookin' like (nearly) finished house.