Tuesday, March 23, 2010

fixed!

For years (now), we've known that we needed to make a fix on our septic system; today's it's done. :) After Roger succeeded in finding the septic line yesterday, Matt went up the hill this afternoon and repaired its connection to the tank.

Here, he tested the line by running water through it--everything worked beautifully.
Take a good look at these holes and piles--they'll be gone after tomorrow!

Also, Matt renewed our building permit yesterday (after surviving a fire drill in the county office...) All of which means we're now ready for an inspection on Friday. Here's hoping it all goes well!

Sunday, March 21, 2010

details, details

It's been a good couple of days of work this weekend, taking care of more details in preparation for an inspection (and for move-in!!).

Matt and I went up on Friday, and he lacquered the beautiful cabinet doors that Dad built. Isn't Matt's door-hanging-for-spraying trick clever?
And, of course, he lacquered the drawer fronts, too, as the sun set.
Saturday, Mom and Dad, Emily, Phil and Shan came up to take care of projects. Mom vacuumed. And then re-vacuumed. And, again, re-vacuumed.

Building makes a lot of dust.
Dad hung most of the cabinet doors, which is really pulling the kitchen together. :)
In the distance, you can see Phil and a piece of trim for the stairway.
Here are the kitchen cabinets after Saturday--looking good, don't you think?
Mom removed all the plastic from the appliances, and she and Shan took more plastic off the windows outside--our view is getting clearer and cleaner.
Emily and Matt did some landscaping planning, and began reshaping the hill in front to be more lovely.

I think that removing the giant pile of dirt by the road goes a long ways toward making the property look less like a construction site... :)

Shan helped Phil hang a few pieces of trim on the stairs--finishing touches that look excellent.
The fading light (and a cold) didn't stop Phil's work.

Today, Matt and I went back up the hill to retrieve the plans, as we realized we need to renew our building permit (again). This gave me a chance to hang some simple curtains in the downstairs bathroom. Now we have a door AND curtains--sophisticated.
When we arrived, we found Roger at work digging to help us fix up the septic system. But, when we couldn't find what we were looking for, our neighbor Bob decided to call on the memory of an old friend and neighbor, while Matt explored the options up close.

Happily, we've since found some paperwork evidence that should help the task. That, and it's still just exciting to have the help of a backhoe. Backhoes are WAY more fun than shovels.

Sunday, March 14, 2010

some crappy work

Lucky for me, I was away this weekend, while Matt was digging to the (overflowing) septic tank. Here he is bailing it out a bit. Crappy, eh?
Some quite nice things happened, too, though, including one most visible through absence: check out the yard without a trailer parked in it! Thanks to neighbors Bob and Eric, who shared 4wd and expertise to make it possible to get it up the hill to the road.
Here's the trailer, which Matt towed down the hill to Nona's driveway, where it'll get a little (much-needed) TLC.

Dad helped with lots of projects--including plenty of workshop time at home during the week, getting cabinet doors, drawer fronts and trim pieces ready. Here he is straightening out a 3-way switch that was just a little mixed up.

Matt went up again on Sunday, when the weather was more pleasant, and made good use of the space freed up by moving the trailer! Here, it's home to a new painting spot, for the last interior door.

Then, he continued to clean the garage, heartened by Mom's good work the day before. He built a clever rack for lumber and containing a bit of our mess.
Looks quite organized, no? Perhaps even like the kind of garage you could park a car in!
Ah, yes. It works.
Nicely done, all!

Sunday, February 28, 2010

putting things into place

Yesterday was another wet winter day in Julian--but we kept busy and warm (for the most part) in the house.

We put the kitchen range into its place, lifting it carefully over the pretty new floors.Matt showed off some acrobatic skill getting it plugged in.
Emily climbed into its hole to try to corral the cord into place so it'd all fit nicely...
and then showed her acrobatic skill in getting out before it slid into its final place.
Nice, eh?
We put up all the final bits of window and door trim, and Mom worked hard getting them all sanded and ready for lacquer.
Emily and I put up the rest of the baseboard--now it's all in place. Even behind the laundry area and in the closets. :)
Matt started hanging the lovely new shower door downstairs--the doors in place, but the tile-cutting bit wore out before he could get the side panel installed. It's gonna look great, though!
And, again, Mom worked at conquering the muddy disaster that has become of our entryway. Now there's plastic dropcloth protecting it. And, someday, hopefully, our walkway paths will make travel from the street and the garage a little less muddy...
As Mom and Dad left, the snow began to fall. Matt and I stayed to lacquer the new wood trim, and by the time we left, there were 3" of snow in the driveway. It was coming down fast, in giant clumps!
We're happy to report that the window and door trim is all installed and lacquered, the baseboard all in, the pump that recirculates hot water all wired and functioning, stairway trim partway done, appliances installed...and we're nearly ready for an inspection. Perhaps one more weekend of clean-up and odd jobs and we'll be ready. :) Then (inspector willing) we'll be ready for a real electrical hookup. And we can turn the heater on. Ahhh...

Plus, Dad's been hard at work on cabinet doors and drawer fronts in his home workshop. Soon we'll be lookin' like (nearly) finished house.

Saturday, February 20, 2010

a muddy day for details

Welcome to the house: with gorgeous wood floors, and the tile floor we're sure glad we installed in the entryway. 'Cause look at that mud...
It was rainy all day today, and chilly in the house, but we enjoyed some time together, anyhow. The lemon meringue pie was good, too! (For evidence of this, look at the brightness of Dad's smile as he dishes himself a piece...) The kitchen's as clean as it's been, thanks to Mom's cleaning and sorting.

In the garage, Phil got to work lacquering the baseboard, while Shan put polyurethane on some oak trim pieces.
Dad took care of lots of little jobs, including detaching the range cord so it can be shortened.
Shan sanded the trim around doors downstairs, getting them ready for lacquer. We ran out today, but things are all ready for next time.

Shan and I started installing baseboard, getting creative with the strange angles in the big room's walls. It's looking pretty nice!
Here we are toward the end of the day. We'd thought we were past the point where saws belong in the house, but the rain and the mud between the house and garage convinced us that the big room makes a fine workspace for the time being. :)
Phil got some vent covers in, trimming the floor to make it work. If only we hadn't had to move the stairs (almost exactly a year ago!), this would have been less work today, too...
Matt and I also installed the upstairs bathroom vanity--another antique dresser transformed into a vanity. Now, given that it has a door and toilet paper, the upstairs bathroom is definitely the finest one to use. Thanks to Mom for cleaning it all up and getting it ready to use.
The big (unexpected) excitement, though, came from our attempts at getting Matt's truck out of the mud. It was convenient unloading the vanity from so close to the front door...but not so convenient to get the car back to the road. Here's a few fun pics of the project--toward the end, you get to meet our new neighbor, Bob, whose pulley figured prominently in the eventual solution. Thanks, Bob!



Sunday, February 14, 2010

floored

The big job this past weekend: finishing the wood floor.

Matt and I went up on Friday to do our last bits of sanding and prep work, put down the sanding sealer, and get the first coat of polyurethane down. If you look closely here, you can see the reflection of Matt in the left window, as he puts the finish down. :)We finished the first coats on the floor, admiring how good the oak looks with a clear coat on top!
On Saturday, Mom and Emily came up with us, to sand and add another coat of polyurethane, and to do a bunch of other jobs. Now, the electrical box is well-labeled, the wall patch in the bathroom is repainted, the hot water pump is mostly installed, and the step up to the front porch is done and stained!


See, it makes us happy...
Today, Matt and I went back for the final coat--here's Matt just before sanding the floor. We definitely got better--or else we did a better job of estimating how long things will take: the last coast took less time than we figured.

This is a new phenomenon for us.
The floor is looking great, and we look forward to it getting nice and hard before next weekend, when we'll return for more fun!